Kitchen Remodel

Our kitchen renovation is a slowly progressing, ever changing beast. Here's our most current todo list:

  • Remove traffic-blocking peninsula
  • Remove all base cabinets
  • Remove all upper cabinets
  • Move fridge to opposite side of room
  • Install all new base cabinets from IKEA
  • Move sink
  • Install dishwasher
  • Upgrade stove to commercial-grade gas unit
  • Upgrade lighting
  • Remove/refinish ceiling
  • Sister floor joists
  • New hardwood, bamboo or cork floors
  • Remove silly boxed-out area above cabinets
  • Install all new upper cabinets
  • Move bathroom door
  • Create breakfast nook where fridge used to be
  • Paint, trim, finish
Percentage Complete: 
30
Percent Recent: 
0

HouseBlogs.net

Powered by Drupal, an open source content management system